Constructing a sand volleyball courtroom is a rewarding however difficult mission, particularly when confronted with distinctive terrain obstacles. TeamLVC Administrators Chris Hosley and Taylor Teal, took on the bold job of setting up a professional-grade sand volleyball courtroom of their yard in upstate New York. Because the founders of Workforce LVC, a volleyball membership that has made waves within the area, Chris and his spouse, Taylor, had been decided to create a high-quality courtroom that may function each a observe venue and a testomony to their dedication to the game. Under, Chris shares his detailed course of, the instruments and supplies he used, and precious ideas for anybody trying to construct their very own courtroom.

Instruments Wanted
  • Gasoline-Powered Tamper & Hand Tampers: Important for compacting the bottom and guaranteeing a secure basis.
  • Shovels (Small and Giant): For shifting grime and sand throughout the leveling and filling processes.
  • Gravel Rakes: Used to unfold gravel and sand evenly.
  • Mushy-Confronted Mallets: Excellent for putting and leveling retaining wall blocks.
  • Wheelbarrow: For transporting supplies like gravel, sand, and grime.
  • Skid Steer: Extremely really helpful for transportation, land clearing, or digging if accessible.
Supplies Wanted:
  • Black Street Cloth: Laid underneath the sand to forestall weed progress and guarantee correct drainage.
  • Dust: Used to degree the bottom earlier than building.
  • Gravel: For filling retaining wall blocks (non-obligatory based mostly in your website’s drainage wants).
  • Rip Rap Stone: To assist any pitched wall areas.
  • Retaining Wall Block: Chris used concrete blocks, however 6×6 pressure-treated wooden might be another.
  • Sand: Roughly 190 tons of top-quality seaside sand had been used to reduce mud and compaction.

The overall materials prices had been between $10,000 and $12,000, which included the sand, retaining wall blocks, and different obligatory provides.

Step-by-Step Course of:
  1. Stage the Floor:
    Chris began by leveling the bottom. Because of the uneven terrain, sure areas wanted to be constructed up, and the bottom was barely pitched in direction of the middle to help drainage.
  2. Lay Down Gravel (Optionally available):
    In case your website doesn’t have built-in drainage, contemplate laying down gravel earlier than continuing. Chris skipped this step since his website was constructed over a leach area with pure drainage capabilities.
  3. Lay Down Street Cloth:
    Chris positioned street material throughout your entire space to forestall weed progress and guarantee correct drainage underneath the sand.
  4. Deliver within the Sand:
    The subsequent step was transporting and spreading the sand on prime of the material. Chris used round 190 tons of sand, guaranteeing a depth of about 18 inches throughout your entire courtroom.
  5. Mark and Sq. Off Corners:
    He then marked the corners the place the retaining wall could be constructed, guaranteeing that the courtroom dimensions allowed for at the least 10 toes of playable space on both sides.
  6. Construct the Retaining Wall:
    Utilizing concrete retaining blocks, Chris constructed the wall across the courtroom. Every block was leveled individually, and gravel was used to fill the middle of every block for added stability. The wall was constructed two programs excessive with a topper for a completed look.
  7. Lengthen the Street Cloth:
    The street material was prolonged to the sides of the retaining wall, guaranteeing it was securely in place to keep up the integrity of the sand and drainage.
  8. Unfold Sand Evenly:
    Chris used rakes to distribute the sand evenly throughout the courtroom, sustaining a constant depth of round 18 inches.
Setting Up the Internet

For the online, Chris and Taylor put in a Spectrum web system. They buried 4 items of 18″ x 12″ pressure-treated plywood (two per pole) with connected hooks for securing the tie-down cam straps. Mini plastic discs had been buried within the sand and linked with bungee cords to maintain the boundary strains tight and in place.

Remaining Ideas and Prices

The mission was a major funding in each time and supplies. The prices may have been significantly increased if Chris had employed professionals or wanted to hire extra gear like a skid steer. The top result’s a high-quality courtroom that may present years of enjoyment and function a superb coaching floor for Workforce LVC. Should you’re contemplating constructing your personal sand volleyball courtroom, Chris’s expertise provides precious insights and sensible recommendation that will help you efficiently full your mission.

Watch the Course of

For a visible overview of Chris Hosley’s building journey, try the 30-second video that captures among the steps from leveling the bottom to the ultimate touches on the courtroom.



TeamLVC (Albany, NY) is a member of the Junior Volleyball Affiliation, a corporation dedicated to enhancing the junior volleyball expertise for membership administrators, coaches, gamers, and followers.